Project Scheduler
Round Rock, TX 
Share
Posted 3 days ago
Job Description
Description

About Us

At HDR, we specialize in engineering, architecture, environmental and construction services. While we are most well-known for adding beauty and structure to communities through high-performance buildings and smart infrastructure, we provide much more than that. We create an unshakable foundation for progress because our multidisciplinary teams also include scientists, economists, builders, analysts and artists. That's why we believe diversity is our greatest strength. HDR is proud to be an equal opportunity workplace and an affirmative action employer.

Watch Our Story:

We believe that the way we work can add meaning and value to the world. That ideas inspire positive change. That coloring outside the lines can illuminate fresh perspectives. And that small details yield important realizations. Above all, we believe that collaboration is the best way forward.

Primary Responsibilities

In the role of Scheduler, we'll count on you to:

  • Develop, evaluate, compile and present schedule data, and utilize such data to develop schedules for execution of work for small to medium-size projects.
  • Demonstrate familiarity with scheduling concepts of related work activities, logic diagrams, schedule resources, schedule milestones, level of effort, and general presentation of schedules in various formats.
  • Perform other duties as needed.

#LI-KT1

Qualifications

Required Qualifications

  • Bachelor's degree
  • Minimum of 2 years in Construction Scheduling
  • Basic understanding of scheduling software for storing data and presenting schedules in various levels and forms of detail - Primavera (P6), Microsoft Project, SureTrak, and/or other scheduling products
  • Experience with Microsoft Office
  • An attitude and commitment to being an active participant of our employee-owned culture is a must

Preferred Qualifications

  • Ability to interpret construction schedules

Why HDR

At HDR, we know work isn't only about who you work for it's also about what you do and how you do it. Led by the strength of our values and a culture shaped by employee ownership, we network with each other, build on each other's contributions, and collaborate together to make great things possible. When you join HDR, we give you license to do the same. We help you take charge of your career, giving you multiple growth opportunities along the way.

Primary Location: United States-Texas-Round Rock
Other Locations: United States-Texas-Austin, United States-Texas-San Antonio
Industry: Highway + Road
Schedule: Full-time
Employee Status: Regular
BusinessClass: Project Controls
Job Posting: Sep 25, 2023

At HDR, we are committed to the principles of employment equity.

USA: We are a Federal Contractor, Affirmative Action and Equal Opportunity Employer. We consider all qualified candidates regardless of minority, veteran, disability, sexual orientation, gender, gender identity or any other status protected by law.

CANADA: We welcome applications from all qualified individuals.

AUSTRALIA: We consider all qualified candidates regardless of gender, ethnicity, country of birth, political or religious affiliation, health status, or any other status protected by law.

At HDR, health and safety matters.

For some positions, you may be required to provide drug and alcohol testing, before or during employment, based on our Drug Testing and Drug Free Workplace Policy.

If you are required to drive for us, we require a valid driver's license and compliance with our vehicle policy.

 

Job Summary
Company
Start Date
As soon as possible
Employment Term and Type
Regular, Full Time
Required Education
Bachelor's Degree
Required Experience
Open
Email this Job to Yourself or a Friend
Indicates required fields